Online

Brand new 1 Bedroom villa for Sale Leasehold in Bali Canggu - RF5321


Canggu Residential side
IDR
2.887.500.000
leasehold
Bedroom : 1
Bathroom : 1
Land Size : 89 m²
Building Size : 89 m²
Leasehold Period : 23 year(s)

Brand new 1 Bedroom villa for Sale Leasehold in Bali Canggu - RF5321

12 Units available: price varies from 2.887.500.000 IDR depends on the unit position

This modern, two-story villa in Canggu is just a 6-minute drive from Batu Belig Beach. Built on a 0.89-acre (approximately 0.3-hectare) plot and offering 89 square meters of living space, it boasts stunning views of the surrounding rice paddies and is situated in a peaceful residential area.

The enclosed living room provides an intimate and inviting space, while the outdoor terrace allows you to fully enjoy the tranquil surroundings. Fully furnished and move-in ready, this villa combines modern design with comfort. Benefiting from a 23-year leasehold, it represents an excellent opportunity for a primary residence or a long-term investment in one of Bali's most desirable areas.

* All transactions are in IDR only. Other currencies will fluctuate according to the exchange rate of the day and to be used for reference only.

Monthly Cost

Monthly Cost For Yearly Rental

General Information

Land Size : 89 m²
Building Size : 89 m²
Year of Build : 2024
Floor Level : 2
View : Rice field
Style / Design : Modern
Surrounding : Residential area
IMB : On Request
Leasehold Period : 23 year(s)

Indoor

Living room : Enclosed
Dinning room : Enclosed
Kitchen : Enclosed
Bedroom : 1
Bathroom : 1

Outdoor

Swimming Pool : Yes
Pool Size : 5X10
Terrace : Yes

Facilities

Furniture : Furnished
Electricty power (watt) : 7.000
Air Conditioner : 2
Water Source : Drilled Wells
Internet : Fiber Optic Access
Parking : Open
Parking size : 1

Similar Properties

Area: Canggu

Sub Area: Residential side

Bathroom : 2

Land Size : 116 m²

Building Size : 138 m²

Living room : Opened/Enclosed

Leasehold Period : 30 year(s)

Show unit available for viewing | Off-Plan: Estimated completion in March 2026